Tianjin Economic-Technological Development Area (TEDA)
established in 1984
Micro-Electronics Industry Park (Xiqing)
----------------------------
Yat-sen Scientific Industry Park
----------------------------
TEDA Industrial Park
3 sub-zones established in 1996:
Tianjin Export Processing Zone (TEPZ)
established in 2000 in TEDA
West Area
the expansion area of TEDA in 2003
Micro-Electronics Industry Park (Jinnan)
established in 2003
Nangang Industrial Zone ,established in 2009
 
Home > About TEDA > Sections > Nangang Industrial Zone  
Sections
 

Nangang Industrial Zone  >>> Click to enter Nangang Industrial Zone 

Positioning of the development

A world-level heavy and chemical industry base and harbor; an important part of the "dual-city, dual-harbor"space development strategy of Tianjin, a world-class demonstration zone of circular economy.

Planned area

The total planned area of Nangang Industrial Zone is 200 square kilometers, of which the terrestrial area is 162 square kilometers.

Infrastructure

Road: A road system in the "chequered" pattern will be adopted in traffic planning within the industrial zone. The expressway and urban trunk road will constitute a comprehensive road system featuring "six main horizontal roads and five main vertical roads."

Water supply: There are surface water, desalinated seawater, recycled water, the direct use of seawater and other water sources that contribute to the water supply capacity of 1100,000 tons per day, ensuring the use of water in the regional development.

Electricity supply: According to the plan, a 500KV transformer substation and seven 220KV transformer substations will be newly built within the industrial zone.

Industrial gas: The natural gas will be transported from Dagang Oil Field, Bohai Oil Field, Shanbei Gas Field, Huabei Oil Field and other sources of gas supply. A natural gas storage and distribution station and a high pressure regulating station will be installed within the industrial zone.

Heat: According to the plan, a thermal power plant with the installed capacity of 6*300 MW will be newly constructed.

Waste disposal: According to the plan, two waste water disposal plants will be constructed, one with the disposal capacity of 150,000 cubic meters per day and the other, 200,000 cubic meters per day. A center for the recovery and treatment of renewable resources will be installed.

Contact Us

The Administrative Commission of Nangang Industrial Zone:

022-25202691 25201352 25202847

The Call Center of Tianjin Economic-Technological Development Area (TEDA):

022-25201111  25201114